Workstation Capacity Optimization Using Theory Of Contraint and Drum-Buffer-Robe Methods

(1) * mutia meilanda Mail (Universitas Pembangunan Nasional "Veteran" Jawa Timur, Indonesia)
(2) Rr. Rochmoeljati Mail (Universitas Pembangunan Nasional "Veteran" Jawa Timur, Indonesia)
*Corresponding author

Abstract


A company in Pasuruan that produces speaker components is facing a bottleneck problem in cone paper production due to fluctuations in demand resulting in an imbalance in machine capacity and cycle time. This results in the cone paper production process being inefficient in meeting targets, making throughput suboptimal. To overcome these problems, you can apply Theory of Constraints (TOC) through the Drum-Buffer-Rope approach and Linear a Programming which is processed using WinQSB software. The research phase includes constraint identification, constraint exploitation, constraint subordination and constraint elevation. Based on the calculation, botlleneck occurs at the cone printing (SK -1) and coating (SK - 4) work stations. To overcome this, 2 hours of overtime was added at both work stations in August 2024 - January 2025. This step successfully increased throughput, the initial throughput of 80,669,0700 increased by 99,103,4200 or 19%. Thus, this proposal proved to be effective in optimizing throughput and maximizing production capacity utilization.


Keywords


Bottlenenck, Drum-Buffer-Robe, Linear Programing, Theory of Constraints

   

DOI

https://doi.org/10.33122/ejeset.v7i1.671
      

Article metrics

Abstract views : 0

   

Cite

   

References


Adhiputra, R. F. (2021). Optimalisasi Kapasitas Produksi Produk Pds Fender Pada Pt Arkha Jayanti Persada Dengan Theory Of Constraints Menggunakan Lindo Dan Pomqm. Journal Industrial Servicess, 7(1), 83. Https://Doi.Org/10.36055/Jiss.V7i1.12049

Agraprana, A. A., & Donoriyanto, D. S. (2024). Optimization Of Production Process By Applying Theory Of Constraint ( Toc ) At Cv . Wijaya Mandiri Label. 5(1), 192–200. Https://Doi.Org/10.22441/Ijiem.V5i1.22515

Arista, Y. A. (2020). Analisis Pengukuran Waktu Kerja Dalam Menentukan Waktu Standar Di Pt Xyz. Comasie, 05(03),122–131.

Bidiawati, A., & Setiawati, L. (2020). Kajian Drum-Buffer-Rope Berbasis Theory Of Contraint Untuk Menyeimbangkan Aliran Produksi. Inaque : Journal Of Industrial And Quality Engineering, 8(1), 59–68. Https://Doi.Org/10.34010/Iqe.V8i1.2764

Damayanthi, H., & Hidayat, S. (2020). Pengukuran Waktu Baku Stasiun Kerja Pada Pipa Jenis Sio. Seminar Dan Konferensi Nasional Idec 2020, 2, 1–9.

Delinda Brilian Cahayani1, R. R. 1the. (2025). Optimization Of Production Capacity Jumbo Bag By Method Theory Of Constraints. 06(02), 1–6. Https://Doi.Org/10.37899/Journallamultiapp.V6i2.1920

Dr. Ir. Suradi, St., M. (2020). Beban Kerja Teori Dan Aplikasi Bata Ringan (M. Rizal Syarifuddin, St. (Ed.)). Cv. Nas Media Pustaka. Https://Www.Google.Co.Id/Books/Edition/Beban_Kerja/-Ycweaaaqbaj?Hl=Id&Gbpv=1&Dq=Waktu+Siklus+Waktu+Baku&Pg=Pa51&Printsec=Frontcover

Giu, J. D., Junus, S., & Arifin, Y. (2022). Optimalisasi Kapasitas Produksi Tepung Kelapa Dengan Metode Rough-Cut Capacity Planning. Jurnal Teknologi Pertanian Gorontalo (Jtpg), 7(1), 41–50. Https://Doi.Org/10.30869/Jtpg.V7i1.906

Hermawan, S. (2023). Akuntansi Perusahaan Manufaktur Surabaya. In M. . Diana Purnama Sari, S.E (Ed.), Surabaya: Penerbit Graha Ilmu. Pt Global Eksekutif Teknologi.

Hidayat, A. (2021). Perencanaan Kapasitas Produksi Menggunakan Metode Rough Cut Capacity Planning (Rccp) Untuk Memenuhi Permintaan Konsumen Pada Pt X Bandung. 4(1), 21–28. Http://Repository.Ekuitas.Ac.Id/Handle/123456789/969

Ikhwana, A., Taptajani, D. S., & Nurul Hikmah, I. W. (2024). Perencanaan Kapasitas Produksi Industri Pakan Ternak Dengan Metode Theory Of Constraints. Jurnal Kalibrasi, 22(1), 63–72. Https://Doi.Org/10.33364/Kalibrasi/V.22-1.1513

Kurniasanti, E., Lutfillah, N. Q., & Muwidha, M. (2022). Identifikasi Kendala Dengan Kolaborasi Theory Of Constraints Dan Supply Chain Management. Jurnal Pajak Dan Keuangan Negara (Pkn), 3(2), 220–235. Https://Doi.Org/10.31092/Jpkn.V3i2.1227

Kusumawati, A., & Wiguna, R. (2020). Penerapan Drum-Bufferrope Pada Stasiun Bottleneck Pt Phapros Semarang Dengan Theory Of Constraint. Analisis Pengendalian Persediaan Material Batu Bara Di Pt. Aaa Dengan Teknik Lot Sizing, 7(1), 1–3.

Mariantha, H. N. (2018). Manajemen Biaya; Cost Management. In M. S. Andi Gunawan Ratu Chakti, S.E. (Ed.), Manajemen. Celebes Media Perkasa. Https://Books.Google.Co.Id/BooksId=7da0dwaaqbaj&Lpg=Pp1&Ots=F0x_Vbqnd2&Dq=Secara Umum Dasar Pemikiran Toc Adalah&Lr&Hl=Id&Pg=Pa15#V=Onepage&Q&F=False

Putri, F. U., Aryanny, E., Studi, P., Industri, T., Nasional, U. P., & Anyar, G. (2025). Optimalisasi Kapasitas Stasiun Kerja Dengan Pendekatan Theory Of Constraint Untuk Meningkatkan Jumlah Produksi Optimization Of Workstation

Capacity Using The Theory Of Constraints. 14, 702–712.

Rahayu, M., & Juhara, S. (2020). Pengukuran Waktu Baku Perakitan Pena Dengan Menggunakan Waktu Jam Henti Saat Praktikum Analisa Perancangan Kerja. Unistek, 7(2), 93–97. Https://Doi.Org/10.33592/Unistek.V7i2.650

Rohman, A. S., & Muhammad, C. R. (2022). Peningkatan Throughput Garmen Melalui Perbaikan Stasiun Kerja Bottleneck Dengan Theory Of Constraint. Jurnal Riset Teknik Industri, 99–108. Https://Doi.Org/10.29313/Jrti.V2i2.1138

Rudiawan, H., Kunci, K., & Produksi, M. (2021). Peranan Manajemen Produksi Dalam Menyelaraskan Kinerja Perusahaan. Jurnal Manajemen Fe-Ub, 9(2), 66.

Widiawati, J. A., & Sibarani, A. A. (2024). Usulan Penjadwalan Flow Shop Dengan Metode Drum Buffer Rope Dan Campbell, Dudek, Smith (Cds) Untuk Mengurangi Keterlambatan D Perusahaan Tekstile. Electrical Engineering,

Informatics, Industrial Technology, And Creative Media.


Refbacks

  • There are currently no refbacks.


Copyright (c) 2026 mutia meilanda, Rr. Rochmoeljati

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

 
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0